Product Details:
Payment & Shipping Terms:
|
Reference Voltage: | 120-240V | Reference Current: | 5(30)A, 10(60)A, 20(100)A |
---|---|---|---|
Accuracy: | CL 1.0 | Type: | Static Single Phase Electric Meter |
Material: | Poly-carbonate | Terminal Cover: | Long Terminal Cover |
High Light: | Residential Electric Meter,Single Phase Energy Meter |
Static 1 Phase Energy Meter , Anti Tamper Watt Hour Smart Energy Meter
General
The DDS155 type single-phase electronic watt-hour meter adopt exclusive use LSI, the device typifying new periphery component, simple structure, high reliability, low power consumption, long life etc, is suitable for the single-phase AC active electric energy with rated frequency of 50HZ.
Function and features
1. Measure active electric energy, no need of calibration for long-term operation;
2. Adopt dedication meter age chip ADE7755;
3. Adopt lasted electricity dedication integrated circuit including digital multiplier overseas, greatly improved dynamic working range of Meter, making 1 multiple actual overload;
4. Have good mistake linearity in the range of 5%Ib~Imax;
5. Few periphery component, simple structure, low power consumption;
6. Adopt high reliability and long life electronic component, so the meter assume features of high reliability and long life.
7. Way of display: register, LCD, digital tube.
8. Remote interruption of power supply function.
9. Output interface RS485.
Specifications
Rated current(A) | Rated voltage(V) | Rated Frequency (Hz) | Accuracy Class |
1.5(6),2.5(10),5(20),5(30),10(40), 10(60),15(60),20(80),30(100) |
220 or 240 | 50 or 60 | Class 1 or class 2 |
Safety precautions:
* Use only isolated tools.
* Do not connect the meter to a 3 phase - 415V AC - network.
* Place the meter only in dry surroundings.
* Make sure the used wires are suitable for the max current the meter can measure.
* Make sure the AC wires are installed correctly before activating the current/voltage.
* Do not touch the meter connecting clamps directly with your bare hands, with metal, blank wire or other material as you will have the chance of an electricity shock and a possible chance for health damage.
* Make sure the protection cover is placed after installation and has been sealed.
* Installation, maintenance and repair should only be done by a certified electrician.
* Never break the seals or open the front cover as this might influence the functionality of the meter.
* Do not through, drop, kick or other physical violence to the meter as there are high precision components inside that will break or make the meter measure inaccurate.
* Do not mount the meter in area's with harm gas, dust, mildew or insects or on unstable surfaces.
Why Choose Us
* Professional manufacturer for more than 15 years.
* Highly experienced production team in RADARKING factory work-shop.
* QC Systerm: Quality controlled on all production lines, and QC inspectors work independently from the production line.
* Good quality production with quick delivery.
* Accepted OEM/ODM.
* Accepted small MOQ.
* Factory certification: ISO9001, 14000, STS
Contact Person: Mrs. Ada Yang
Tel: 86 15623095278
Fax: 86-27-84967521