Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
WUHAN RADARKING ELECTRONICS CORP.
Home ProductsLora Smart Meter

AMR System Lora Smart Meter Three Phase Four Wires Intelligent Electric Meter

China WUHAN RADARKING ELECTRONICS CORP. certification
China WUHAN RADARKING ELECTRONICS CORP. certification
Really profession in the meter industry, gave us so many useful advice in the AMI solution, very good!

—— George

The meters are good, simple but useful, and also good in after service, each of my question or requirement can be solved well! Thank you for cooperate

—— Amitansu

I'm Online Chat Now

AMR System Lora Smart Meter Three Phase Four Wires Intelligent Electric Meter

AMR System Lora Smart Meter Three Phase Four Wires Intelligent Electric Meter
AMR System Lora Smart Meter Three Phase Four Wires Intelligent Electric Meter

Large Image :  AMR System Lora Smart Meter Three Phase Four Wires Intelligent Electric Meter

Product Details:
Place of Origin: Made In China
Brand Name: Radarking
Certification: IEC62053-21; IEC62052-11; IEC62056-21
Model Number: DTZY150
Payment & Shipping Terms:
Minimum Order Quantity: 50
Price: Negotiate
Packaging Details: Standard Package
Delivery Time: 35days
Payment Terms: Western Union, T/T, L/C, MoneyGram
Supply Ability: 5000000 pcs per year
Detailed Product Description
Voltage: 3* 220V/240V/230V Current: 3*5(100)A
Frequency: 50Hz Accuracy Class: Class 1.0(active); Class 2.0(reactive)
Pulse Constant: 3*800imp/kwh Communication Mode: Carrier, PLC, Wifi, GPRS, RS485
Baud Rate: 2400bps Display Digit: 6+2/5+1 Or Customized
High Light:

Lora Water Meter

,

Lora Gas Meter

Three Phase Lora Smart Meter for AMR System with Active and Reactive Energy

 

Summary: 
 
DTZY150-Z three phase four wires remote fee control smart electric meter is a intelligent electric metering product which made of large scale integrated circuit, with Digital sampling processing technology and SMT craft.

 

Main Parameter:
 

Item   Specification
   
Reference Voltage 3×220V/380V
   
Working Voltage Range 0.8Un~1.15Un
   
Maximum Working Voltage 0.7Un~1.2Un
Reference Current 1.5(6)A 5(40)A 5(60)A 15(60)A 20(100)A
     
Accuracy Active CL 1.0 Reactive CL 2.0
   
Working Temperature -25℃~+60℃
   
Maximum Working Temperature -40℃~+70℃
     

 

 

Light Coupling Pulse:

 

Constant:

 

Factory setting subject to nameplate  
For 1.5(6)A meter: Active 6400imp/kW·h
  Reactive 6400imp/kvar·h
For 5(40)A meter: Active 600imp/kW·h
  Reactive 600imp/kvar·h
               
For 5(60)A /15(60)A meter: Active 400imp/kW·h
          Reactive 400imp/kvar·h
For 20(100)A meter: Active 300imp/kW·h
        Reactive 300imp/kvar·h

 

 

Calendar Clock:

 

Clock Error           ≤0.5 s/d 0℃~+40℃:±2ppm;
                -40℃~+85℃: ±3.5ppm
                 
                 
Clock Frequency               1Hz
                 
Battery Life               10 year
               
Battery Continuous Working Period             ≥5 year
 

Features:
 

1. Remote ON/OFF Control
 

2. Metering

 

  • Positive/reverse active power, positive/reverse apparent power, reactive power in 1,2,3,4 quadrants and active/reactive power in A, B, C phase which can be measured. It can set tagged words of active/reactive combination, aim at positive/reverse active power and reactive power in 4 quadrants, to restructure active combination, reactive combination 1 and reactive combination 2.
  • All power can be time-share measured by total and max 4 tariffs. (No time-share measurement for power in A, B, C phases)
  • It can storage power data for 12 settlement period.
  • For positive/reverse active power, positive/reverse apparent power, reactive power in 1,2,3,4 quadrants and active/reactive power in A, B, C phases, the valid range is 0~999999.99, and unit is kWh or kvarh.

 For active combination, reactive combination 1 and reactive combination 2 power, the valid range is –799999.99~799999.99, and unit is kWh or kvarh.
 
3. Tariff

 

  • It can set solution for 2 time zones, 2 daily periods and switching time (yy/mm/dd/hh/mm) of both two.1st time zone and daily period solution is default selection, when reach switching time of time zone, it changes to 2nd solution of time zone, and when reach switching time of daily period, it changes to 2nd solution of daily period. Then set switching time again for 2 solutions,when reach switching time of time zone, it changes to 1st solution of time zone, and when reach switching time of daily period, it changes to 1st solution of daily period. Switching time would be clear since changes of time zone solution and daily period solution.
  • Max 4 tariffs. Each time zone solution can set 14 time zones as max, with starting time and meter number of daily period which is used. Each daily period solution can set 8 daily periods as max, 14 periods per day, with starting time and tariff which is used. Minimum interval of periods is 15 mins., and period interval is larger than actual demand cycle valve, can be set over 00:00
  • Public holiday can be set, including date and daily period meter number of each public holiday.
  • Weekend holiday can be set, which controlled by tagged word, daily period meter number can also be set for each weekend holiday.

  • If the same for public holiday and weekend holiday, daily period meter number of public holiday will be used.

  • Automatic changeover of century calendar, time, leap year.

  • If tariff number in the period of daily period is larger than tariffs, or the tariffs is 0, the power in the period reckon in tariff 1.

4. Demand Measurement
 
5. Settlement Function
 
6. Meter Clear
 
7. Demand Clear
 
8. Event Clear
 
9. Power Freezing
 
10. Security Management & User Authorization
 
11. Warning Function
 
12. Power Off Meter Reading Function
 
13. Clock, Time Function
 
14. Signal Output Function
 
15. Basic Communiction Function
 
16. LCD Display Function


 

 

 

Notes:
 
No device inside can be adjust by user.
When installing and using, there should be tight enough for each connection line, to avoid from any bad connection which would cause heating to damage the meter. Make sure of the right connection of input and output. Please install the meter on local where is dry and ventilated. Don’t put in the place under direct highlight, especial for infrared window. When using infrared communication, it should take more attention to avoid from any disturb from highlight to infrared interface, and please adjust the distance and angel of infrared, to make sure of reliable communication.
 
 

 
AMR System Lora Smart Meter Three Phase Four Wires Intelligent Electric Meter 0
 
 
 
 

 

 

 

Contact Details
WUHAN RADARKING ELECTRONICS CORP.

Contact Person: Mrs. Ada Yang

Tel: 86 15623095278

Fax: 86-27-84967521

Send your inquiry directly to us (0 / 3000)