Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
WUHAN RADARKING ELECTRONICS CORP.
Home ProductsAdvanced Metering Infrastructure

Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter

China WUHAN RADARKING ELECTRONICS CORP. certification
China WUHAN RADARKING ELECTRONICS CORP. certification
Really profession in the meter industry, gave us so many useful advice in the AMI solution, very good!

—— George

The meters are good, simple but useful, and also good in after service, each of my question or requirement can be solved well! Thank you for cooperate

—— Amitansu

I'm Online Chat Now

Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter

Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter
Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter

Large Image :  Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter

Product Details:
Place of Origin: Made in China
Brand Name: Radarking
Certification: ISO9001, ISO4001
Model Number: RDK
Payment & Shipping Terms:
Minimum Order Quantity: 1 nos
Price: Negotiate
Packaging Details: Standard Package
Delivery Time: 35 days
Payment Terms: Western Union, L/C, T/T
Detailed Product Description
Content: Smart Electric Meter, Data Collector, Data Concentrator Installation: Direct Connected
Type: Smart Meter Infrastructure System Water Meter: Smart Water Meter DN15, 20, 25mm
Database: SQL ORACLE O/S: Window
High Light:

smart meter infrastructure

,

advanced metering system

Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter

 

Brife Introduction:

Remote valve control water meter is featured in remote meter reading and remote valve control. The administrative department can copy each meter's reading in the office instead of going out copying the meter house by house. And also the defaulting users can be controlled by the remote valve control.


Features:

 

  • All key technologies by Radarking company developed with independent intellectual property rights,to ensure the ongoing maintenance and upgrading of the system,to provide users with long-term technical support and after-sales service, from the user to worry about;
  • Collector system with automatic search function, without human intervention, automatically complete debugging, greatly reducing system installation period;
  • The key components of the system - the multi-channel wireless module by Gaoxiang company independent development and production, all-digital integrated circuits, using the most advanced matrix decoding technology, communications frequency automatic calibration technology, wireless network technology, dynamic self-maintenance a number of leading-edge technology to ensure the system is stable and reliable;
  • Wireless communication technology parameters and indicators in line with the Ministry None [2005] No. 423 "Technical Requirements micro power (short-range) radio equipment";
  • Acquisition counting operation unit of the meter are fitted within the smart meter, data acquisition, processing, storage and other infrastructure work done by the whole smart meter itself, the data acquisition device communication links only to eliminate the impact of external factors on the measurement;
  • Electronic unit completely independent research and production company by the Gaoxiang, highly integrated electronic circuit, product failure rate is very low;
  • Data storage function: the meter and equipment using highly reliable non-volatile memory, data can be stored for more than a decade, will not be lost due to power failure or change;
  • Systems management software is completely independent research and development, free upgrades for life.


Install and use:

 

  • Concentrator using wall-mounted, with three fixing holes, can be directly fixed to the wall surface;
  • Concentrator outdoor installation, configuration outdoor protective box, choose not to be rain, direct sunlight is not the place, the installation location should be less than the nets;
  • The concentrator should be selected in the collector relatively centralized location for installation;
  • After the focus is fixed, will be supporting the antenna securely connected to the antenna terminal concentrator, concentrator antenna fixed location should be near the level of distance from the wall more than 30 cm, height of 1.5 meters above the ground;
  • The concentrator will need to install an open subscription packages GPRS traffic (over 30M monthly traffic) services Mobile or China Unicom phone cards;
  • Concentrator supply should be stable protect against data loss due to power interruption unable Collecting, power lines should be used in 2 × 0.75mm2 or thicker wire, and install leakage protection device;
  • Concentrator AC power AC 220V, 50Hz, and began to work properly;
  • The installation is complete, record collector ID number, easy maintenance and management.

 

 

Remote Advanced Metering Infrastructure For Smart Cold / Hot Water Meter 0
 

Contact Details
WUHAN RADARKING ELECTRONICS CORP.

Contact Person: Mrs. Ada Yang

Tel: 86 15623095278

Fax: 86-27-84967521

Send your inquiry directly to us (0 / 3000)